Adares Wind Power Plants

ADARES WPP

Located within the borders of Selçuk, İzmir and Kuşadası, Aydın, Adares WPP attained a production license on 12.05.2011 thanks to YGT Elektrik Üretim A.Ş. The first acceptance by the Ministry of Energy and Natural Resources for Adares WPP whose construction began in late 2014 was initiated in 2015 and the plant’s 10 MW-section was put into use the same year. The installed power of Adares WPP increased to 22 MW with a capacity increase in 2016. The capacity increase was put into use in February 2021 with three Enercon E-126 4 MW-turbines.

Adares WPP has an installed power of 22 MW with five Gamesa G97 2 MW-turbines and three Enercon E-126 4 MW-turbines. An additional capacity increase of 11 MW was performed in 2022 upon the permission to increase the capacity. Works continue to put capacity increases into use.

Address: Selçuk / İZMİR

Phone/Fax: 0232 894 1021 / 1022

Bewen Enerji
License Installed Power
33 MWm/33 MWe
Bewen Enerji
Installed Power Commissioned
22 MWm/22 MWe
Bewen Enerji
Average Annual Production
60.706.000 kWh
Bewen Enerji
Turbins
Five Gamesa G97 2 MW-turbines and three Enercon E-126 4 MW-turbines
Bewen Enerji
Average Annual Decrease Carbon
37.625 metric tons