YAHYALI SOLAR POWER PLANTS

Bewen Energy is establishing a 71.4168 MW Solar Power Plant as an auxiliary source for the Yahyalı Wind Power Plant in Kayseri. It is intended to serve as a combined renewable electricity production facility together with the solar energy investment. With the acceptance of 4 inverter groups in March 2024, 3 inverter groups in May 2024, 4 inverter groups in July 2024 and 3 inverter groups in August 2024 an additional capacity of 60,0743 MW was put into operation. The Solar Power Plant investment is aimed to be completed on February 2025.

Address: Yahyalı / KAYSERİ

Phone/Fax: 0352 619 1201 / 1200

Bewen Enerji
Licensed Installed Power
71,416
Bewen Enerji
Installed Power Commissioned
60,0743 MWm
Bewen Enerji
Average Annual Production
115.200 MWh
Bewen Enerji
Average Annual Decrease Carbon
71.400 Tons